Video & News 👇

Play Video
13 new stops under construction
 

Metro 4, the new metro line of Milano, is already operational and connecting Linate Airport to the City Centre since summer 2023.

However the 8 stops already open from the “city airport” to Piazza San Babila are only the first delivery of this work. In fact 13 additional stops are currently under construction. In total, over 2.2 billion euro are being invested in this new line to improve the mobility in Milano for residents and visitors.

The target for the completion of the full line is currently December 2024.

This is the list of the 21 stops of the full line:

Already operational:

1) Aeroporto Linate

2) Repetti

3) Stazione Forlanini

4) Argonne

5) Susa

6) Dateo

7) Tricolore

8) San Babila

Under construction:

9) Sforza Policlinico

10) Santa Sofia

11) Vetra

12) De Amicis

13) S. Ambrogio

14) Coni Zugna

15) California

16) Bolivar

17) Washington Tolstoj

18) Frattini

19) Gelsomini

20) Segneri

21) San Cristoforo

Play Video